Upgrade of firefighting system at Feriana station
Location | Feriana station |
Year | 2024 |
Client | SCOGAT |
Duration | 1 year |
Project Description |
Upgrade of firefighting system at Feriana station • Engineering • Procurement • Excavation works • Buried PEHD line installation • Replacement of fire pumps (electric pump, diesel pump and jockey pump) including their local control panels • Firefighting equipment replacement including fire hydrants, boxes, fire hoses and water monitors • Piping prefabrication, sand blasting and painting, and installation • Valves installation • Electrical and instrumentation works |