Waha Flaring system construction

Location Waha field
Year 2015
Client OMV
Project Description Construction of waha flaring system for blowdown collection of the gas valorization compressor and the four gas lift compressors to the flare including piping fabrication ; installation and testing ; pipe supports fabrication & installation; excavation works and buried section installation
• Piping Diameter : 2’’ ;4 ’’and 6’’
• Sch 40 & 80
• Material : A106 Gr B & A333 Gr6
• Total Welded Inchs : 1100’’