Flowline Badr#3

Location Cherouq concession
Year 2010
Client PIONEER
Project Description Engineering, procurement and construction of 8” Oil flow line, relevant interconnection piping, Road Crossing, Inspection, Hydrotest and Start-up for Badr#3 Well Head:
• Pipe Schedule: 40
• Material : API5L Gr B
• Pipeline Length : 0,5Km

’Badr #3 Tie-in with the existing FlowLine Badr#1 was performed without shutdown based on Hot Tapping Technique : attaching branch connection and cutting hole into the operating Badr#1 pipeline using Mirage Hot tap machine (8’’*6’’)
TOP