Construction of waste water treatment plant in Bni Mtir

Location Bni Mtir
Year 2025
Client Office National de l’Assainissement
Duration 20 months
Project Description Engineering, procurement and construction of macrophyte bed-type waste water treatment plant with a flow rate of 222 m³/day, in Beni Mtir, Jendouba governorate.

Works include
• Topographic survey and geotechnical study
• Detailed Engineering and approval by a third party
• Earthworks
• Civil works related to the plant different units construction
• Treated waste water transfer system construction
• Procurement, installation and commissioning of mechanical and electrical equipment
• 2 kW photovoltaic system procurement and construction
• Internal roads construction
• Plant commissioning and start up
• Plant operating during the observation and performance testing period