Construction of waste water treatment plant in Bni Mtir
Location | Bni Mtir |
Year | 2025 |
Client | Office National de l’Assainissement |
Duration | 20 months |
Project Description |
Engineering, procurement and construction of macrophyte bed-type waste water treatment plant with a flow rate of 222 m³/day, in Beni Mtir, Jendouba governorate. Works include • Topographic survey and geotechnical study • Detailed Engineering and approval by a third party • Earthworks • Civil works related to the plant different units construction • Treated waste water transfer system construction • Procurement, installation and commissioning of mechanical and electrical equipment • 2 kW photovoltaic system procurement and construction • Internal roads construction • Plant commissioning and start up • Plant operating during the observation and performance testing period |