Extension of Habib Bourguiba Primary School in Tazerka
| Location | Tazerka |
| Year | 2024 |
| Client | Eni |
| Duration | 6 months |
| Project Description |
Extension of Habib Bourguiba Primary School in Tazerka; construction of a building with a ground floor and a first floor • Ground floor: Preparatory classroom • First floor: Reading room Project general scope description: • Detailed Engineering and its approval by a third party • Earthworks • Excavation • Foundation construction • Reinforced concrete • Masonry and plastering • Flooring • Waterproofing • Metal, aluminum, and wood joinery • Electrical works • Piping and plumbing works |

