Upgrade of firefighting system at Feriana station

Location Feriana station
Year 2024
Client SCOGAT
Duration 1 year
Project Description Upgrade of firefighting system at Feriana station

• Engineering
• Procurement
• Excavation works
• Buried PEHD line installation
• Replacement of fire pumps (electric pump, diesel pump and jockey pump) including their local control panels
• Firefighting equipment replacement including fire hydrants, boxes, fire hoses and water monitors
• Piping prefabrication, sand blasting and painting, and installation
• Valves installation
• Electrical and instrumentation works
TOP